The Travels of Tug 44


The Head and Shower Room





This will eventually be a bathroom with a separate shower next door.



The cabinet is added and the flooring installed.



The hatch in the floor shows the gray-water sump. The shower and sink drains into this container and an automatic bilge pump sends it over the side.



lots of wires ...



Counter top is in and the shower room liner is being installed.



Now we have mirrors and the shower door.



The cabinet is just about done. This is the view thru the bedroom doorway.



This is the view thru the hallway door.



That's the head itself. Note the aircondition vent beside it, great during August!



The flooring is natural wood and the stripes go right thru, not painted on.



All done, as seen thru the bedroom doorway.



Erie Canal   -   Champlain Canal   -   Hudson River   -   Canal History

  Lighthouses   -   Canal Corp Boats   -   Tugboats & Trawlers


Tug 44 Home Page